Silicus has adopted a Quality process improvement program that is in line with the industry standard models like ISO 9001 and CMMi V1.2 dev. To validate the maturity of these processes Silicus India development center went for SCAMPI A assessment for CMMi Level 3 and successfully fulfilled all the requirements for Software Product Development and Software Maintenance Life cycles.
Silicus Software Development Maturity Assessment Results
Silicus Quality Management System is organized to meet the requirements of different project needs and is defined to be flexible and Tailorable for different Software Development Life Cycle Models (SDLC). All the projects that we execute are mandated to strictly follow the established processes.
A dedicated Software Engineering Process Group (SEPG) is formed to plan, define check and act the functioning of different processes and process assets. Each project that we deliver has a representation of SEPG to ensure the definition of these processes at project level, usage of right artifacts, collecting data for measurements and analysis and performing process and product quality assurance.
Our entire QMS is divided into 4 areas and the structure is below:
Process Assets Include Procedures, Guidelines, Templates, Checklists, Forms, Standards and Training Material for each of the Software Development Life Cycle Process Area.
| SNO |
Area |
Life Cycle Process |
Process Assets |
| 1 |
Engineering |
Requirements |
Requirements Definition Requirements Change Management Requirements Management |
| Design |
High Level Design and Architecture Detailed Design and Specifications Alternate Solution Evaluation |
| Development |
Development and Coding Product Integration Unit Testing |
| Testing |
Peer Review (Code Review, Test Review, Design Reviews) Verification Validation |
| Deployment |
Build Management Release Process |
| 2 |
Project Management |
Project Planning |
Estimation Project initiation Resource Management Project Tailoring Project Planning Project Closure Project Knowledge and Skills Planning |
| Project Monitoring and Control |
Project Monitoring Project Control Corrective and Preventive Actions Customer Management Root Cause Analysis |
| Risk Management |
Risk Identification Risk Mitigation and Contingency Risk Management |
| 3 |
Support |
Configuration Management |
Configuration Identification (Baselines) Configuration Management Functional and Physical Configuration Audits |
| Decision Analysis and Resolution (DAR) |
DAR Process Tool and Vendor Evaluations Issue Management |
| Measurement and Analysis |
Measurement Process Analysis Procedures Data Collection and Management |
| Product and Process Quality Assurance (PPQA) |
QA Processes – Product and Process Internal Audit Process |
| 4 |
Process Management |
Organization Process Definition |
Document Data Control Organization Process Definition QMS Feedback |
| Organization Process Focus |
Process improvement and Planning Process |
| Organization Training |
Organization Strategic Training Planning and Process Skill Gap analysis Project Tactical Training Process |
If you would like to know more about our processes and practices, please contact us.
|